Ready Tiger 24-1: Airmen demonstrate the importance of BOS-I

U.S. Air Force Airmen assigned to the 23rd Civil Engineer Squadron, remove a shelter cover from a box at Avon Park Air Force Range, Florida, April 8, 2024. The 23rd CES supported the forward operating site by planning, establishing, constructing, and managing infrastructure. Built upon Air Combat Command's directive to assert air power in contested environments, Exercise Ready Tiger 24-1 aims to test and enhance the 23rd Wing’s proficiency in executing Lead Wing and Expeditionary Air Base concepts through Agile Combat Employment and command and control operations. (U.S. Air Force photo by Senior Airman Rachel Coates)

PHOTO BY: Senior Airman Rachel Coates
VIRIN: 240408-F-TT702-1052.JPG
FULL SIZE: 4.42 MB
Additional Details

CAMERA

NIKON Z 7_2

LENS

VR 70-200mm f/2.8E

APERTURE

56/10

SHUTTERSPEED

1/640

ISO

100

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.