Photos

Keyword: Category: Tag: Sort By:
Airmen from the 23d Logistics Readiness Squadron vehicle maintenance flight repair the hydraulic system on an aircraft loader at Moody Air Force Base, Ga., July 28, 2014. The loader is capable of lifting up to 25 kilograms of cargo onto the HC-130J Combat King II. (U.S. Air Force photo by Airman 1st Class Dillian Bamman/Released)


Checking all the pipes

Airmen from the 23d Logistics Readiness Squadron vehicle maintenance flight repair the hydraulic system on an aircraft loader at Moody Air Force Base, Ga., July 28, 2014. The loader is capable of lifting up to 25 kilograms of cargo onto the HC-130J Combat King II. (U.S. Air Force photo by Airman 1st Class Dillian Bamman/Released)

Related Imagery
Airman st Class Dillian BammanReleased
140725-F-LM669-122.JPG

DOWNLOAD PHOTO
(1.42 MB)



Tags
people



< Back to Main Gallery