Photos

Keyword: Category: Tag: Sort By:
MOODY AIR FORCE BASE, Ga, --  Gary Lamb, 23rd Civil Engineer Squadron, uses a float to level fresh concrete in a new sidewalk in front of Moody’s new Consolidated Base Support Center May 22. The $9.6 million facility is scheduled to be completed this summer. (U.S. Air Force photo by Tech. Sgt. Parker Gyokeres)


Pushing towards perfection

MOODY AIR FORCE BASE, Ga, -- Gary Lamb, 23rd Civil Engineer Squadron, uses a float to level fresh concrete in a new sidewalk in front of Moody’s new Consolidated Base Support Center May 22. The $9.6 million facility is scheduled to be completed this summer. (U.S. Air Force photo by Tech. Sgt. Parker Gyokeres)

Related Imagery
Tech. Sgt. Parker Gyokeres
070522-F-4569G-021.JPG

DOWNLOAD PHOTO
(2.89 MB)



Tags
On-Duty



< Back to Main Gallery