Photos

Keyword: Category: Tag: Sort By:
Airmen of the 723d Aircraft Maintenance Squadron and 41st Helicopter Maintenance Unit, install an HH-60G Pave Hawk engine inlet July 31, 2012, at Moody Air Force Base, Ga. The installation was part of a process that also involved an engine input module change and an engine drive shaft balance. The total process typically takes up to 12 hours to complete. (U.S. Air Force photo by Staff Sgt. Jamal D. Sutter/Released)


Team effort

Airmen of the 723d Aircraft Maintenance Squadron and 41st Helicopter Maintenance Unit, install an HH-60G Pave Hawk engine inlet July 31, 2012, at Moody Air Force Base, Ga. The installation was part of a process that also involved an engine input module change and an engine drive shaft balance. The total process typically takes up to 12 hours to complete. (U.S. Air Force photo by Staff Sgt. Jamal D. Sutter/Released)

Related Imagery
Staff Sgt. Jamal D. SutterReleased
120731-F-PO994-021.JPG

DOWNLOAD PHOTO
(1.31 MB)



Tags
people



< Back to Main Gallery