Skip to main content (Press Enter).
U.S. Air Force Logo
  • About Us
    • Main Menu
    • About Us
    • Units
      • Main Menu
      • About Us
      • Units
      • 23rd Wing
        • Main Menu
        • Units
        • 23rd Wing
        • 23d Mission Support Group
        • 23d Medical Group
        • 23d Maintenance Group
        • 23d Fighter Group
        • 23d Wing Staff
          • Main Menu
          • 23rd Wing
          • 23d Wing Staff
          • 23d Wing Safety
          • Finance
            • Main Menu
            • 23d Wing Staff
            • Finance
            • Frequently Asked Questions
          • Inspector General
          • Staff Judge Advocate
        • 347th Rescue Group
      • Avon Park (598th Range Squadron)
      • Tenant Units
        • Main Menu
        • Units
        • Tenant Units
        • 476th Fighter Group
        • 372nd Training Squadron, Detachment 9
        • 336th Recruiting Squadron
        • Area Defense Counsel
        • OSI
    • Aircraft
    • Biographies
  • News
    • Main Menu
    • News
    • Commentaries
    • Features
    • Photos
    • Art
    • Video
  • Resources
    • Main Menu
    • Resources
    • PCS Information
    • Chapel Services
    • Environmental Initiative
    • Veterans Crisis Line
    • Voter's Assistance
    • Pregnancy Support Programs
    • Pre-Deployment Symposium
    • Suicide Prevention & Awareness
  • 93d AGOW
    • Main Menu
    • 93d AGOW
    • Combat Weather
      • Main Menu
      • 93d AGOW
      • Combat Weather
      • Mission Video
    • Base Defense
      • Main Menu
      • 93d AGOW
      • Base Defense
      • Specialties
      • Mission Video
    • Tactical Air Control Party
      • Main Menu
      • 93d AGOW
      • Tactical Air Control Party
      • Capabilities Packages
  • Public Affairs
    • Main Menu
    • Public Affairs
    • Photo Studio
  • Contact Us
    • Main Menu
    • Contact Us
    • Frequently Called Numbers
    • Finance
  • Sexual Misconduct Disciplinary Actions
U.S. Air Force Logo Moody Air Force Base
  • NEWSROOM
  • Public Affairs
  • Photo Studio
  • Bridge Chat
  • INSPECTOR GENERAL
  • AFFORGEN

    1/9
  • Construction workers build frames for a catch basin during a storm-drain construction project, June 25, 2019, at Moody Air Force Base, Ga. This construction will benefit the base by alleviating flooding, preventing deterioration and erosion and saving money. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Construction workers build frames for a catch basin during a storm-drain construction project, June 25, 2019, at Moody Air Force Base, Ga. This construction will benefit the base by alleviating flooding, preventing deterioration and erosion and saving money. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Construction workers apply foundation prior to laying cement during a storm-drain construction project, June 27, 2019, at Moody Air Force Base, Ga. The 23d Civil Engineer Squadron spent $41,000 to improve the drainage system to prevent safety hazards caused by standing water. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Construction workers apply foundation prior to laying cement during a storm-drain construction project, June 27, 2019, at Moody Air Force Base, Ga. The 23d Civil Engineer Squadron spent $41,000 to improve the drainage system to prevent safety hazards caused by standing water. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Construction workers make progress during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. The 23d Civil Engineer Squadron spent $41,000 to improve the drainage system to prevent safety hazards caused by standing water. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Construction workers make progress during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. The 23d Civil Engineer Squadron spent $41,000 to improve the drainage system to prevent safety hazards caused by standing water. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Alex Rondon, construction worker, applies joints to concrete during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. The construction will rebuild three curb-inlets and reinforce storm-drain piping to improve the draining system and allow rain water to flow into a local creek. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Alex Rondon, construction worker, applies joints to concrete during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. The construction will rebuild three curb-inlets and reinforce storm-drain piping to improve the draining system and allow rain water to flow into a local creek. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Moses Meseiza, construction worker, applies dirt to a curb-inlet frame during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. The construction will rebuild three curb-inlets and reinforce storm-drain piping to improve the draining system and allow rain water to flow into a local creek. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Moses Meseiza, construction worker, applies dirt to a curb-inlet frame during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. The construction will rebuild three curb-inlets and reinforce storm-drain piping to improve the draining system and allow rain water to flow into a local creek. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Rodney Gosier, construction worker, takes a break during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. This construction will benefit the base by alleviating flooding, preventing deterioration and erosion and saving money. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Rodney Gosier, construction worker, takes a break during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. This construction will benefit the base by alleviating flooding, preventing deterioration and erosion and saving money. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Louis Quiroga, construction worker, makes a measurement during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. The construction will rebuild three curb-inlets and reinforce storm-drain piping to improve the draining system and allow rain water to flow into a local creek. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Louis Quiroga, construction worker, makes a measurement during a storm-drain construction project, June 26, 2019, at Moody Air Force Base, Ga. The construction will rebuild three curb-inlets and reinforce storm-drain piping to improve the draining system and allow rain water to flow into a local creek. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Louis Quiroga, right, construction worker, helps Jose Robles, construction worker, climb out of a catch basin during a storm-drain construction project, June 25, 2019, at Moody Air Force Base, Ga. This construction will benefit the base by alleviating flooding, preventing deterioration and erosion and saving money.(U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Louis Quiroga, right, construction worker, helps Jose Robles, construction worker, climb out of a catch basin during a storm-drain construction project, June 25, 2019, at Moody Air Force Base, Ga. This construction will benefit the base by alleviating flooding, preventing deterioration and erosion and saving money.(U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Construction workers transport dirt for a cement mold during a storm-drain construction project, June 25, 2019, at Moody Air Force Base, Ga. The 23d Civil Engineer Squadron spent $41,000 to improve the drainage system to prevent safety hazards caused by standing water. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Construction workers transport dirt for a cement mold during a storm-drain construction project, June 25, 2019, at Moody Air Force Base, Ga. The 23d Civil Engineer Squadron spent $41,000 to improve the drainage system to prevent safety hazards caused by standing water. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Construction workers build frames for a catch basin during a storm-drain construction project, June 25, 2019, at Moody Air Force Base, Ga. This construction will benefit the base by alleviating flooding, preventing deterioration and erosion and saving money. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Construction workers build frames for a catch basin during a storm-drain construction project, June 25, 2019, at Moody Air Force Base, Ga. This construction will benefit the base by alleviating flooding, preventing deterioration and erosion and saving money. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Construction workers apply foundation prior to laying cement during a storm-drain construction project, June 27, 2019, at Moody Air Force Base, Ga. The 23d Civil Engineer Squadron spent $41,000 to improve the drainage system to prevent safety hazards caused by standing water. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Storm drain upgrade saves Moody money

    Construction workers apply foundation prior to laying cement during a storm-drain construction project, June 27, 2019, at Moody Air Force Base, Ga. The 23d Civil Engineer Squadron spent $41,000 to improve the drainage system to prevent safety hazards caused by standing water. (U.S. Air Force photo by Senior Airman Erick Requadt)

    Photo Details / Download Hi-Res
  • Previous
  • Next

Storm drain upgrade saves Moody money

  • Published July 1, 2019
  • By Senior Airman Erick Requadt
  • 23d Wing Public Affairs
MOODY AIR FORCE BASE, Ga. --  
Moody Air Force Base mafb Air Combat Command ACC 23d Wing 23 Wing 9th Air Force ninth air force U.S. Air Force USAF United States Air Force team moody Flying Tigers Airmen attack-rescue-prevail Georgia construction Investing in the Future 23d CES

  • Contact Us
  • Equal Opportunity
  • FOIA | Privacy | Section 508
  • Inspector General
  • JAG Court-Martial Docket
  • Link Disclaimer
  • No FEAR Act
  • OSI Tip Line
  • Resilience
  • Veterans Crisis Line

  • Join the Air Force
  • Air Force Benefits
  • Air Force Careers
  • Air Force Reserve
  • Air National Guard
  • Civilian Service

Connect

U.S. Air Force Logo Official United States Air Force Website
Hosted by Defense Media Activity - WEB.mil